Power lines for Canoa
Sign the petition to stop the power lines
here.
The infrastructure department of the state government has stopped the
construction of the power line. The power line is being financed by the Inter
American Development Bank,
http://www.iadb.org/en/inter-american-development-bank,2837.html. The local
effort is to have them put the lines back in the mountains behind launch, where
the existing lines are.
http://OzReport.com/1505932490
|